Galleria Parkway Streetscape

Location
Ohio
Market
Federal Government
Services
Architecture / Interior Design / Engineering

The Challenge

In 1934, Building 23 at Wright-Patterson Air Force Base was constructed as an aircraft hangar and test facility. More than 70 years later, the U.S. Air Force wanted to renovate the building to provide a modern lab facility for state-of-the-art energy research. It requested a design that retains the historic feel and aesthetic of the original building, while also creating a modern interior that meets security and force protection requirements.

The Solution

A three-story facility was created within the existing brick shell, adding new spaces for material processing, data acquisition, operations, and fabrication. The design also had special acoustical needs due to the use of vibration-sensitive equipment such as lasers and optical equipment. The superstructure is composed of a structural steel frame and designed to resist collapse in accordance with Antiterrorism/Force Protection (AT/FP) requirements.

Barge Design Solutions provided HVAC, plumbing, steam, lighting and power distribution, communications and security, utilities, storm drainage, lighting protection, and fire protection. Site work included sidewalks, curbs and gutters, access drive control systems, and site upgrades to meet AT/FP requirements. Architectural and interior design were also included as part of the project.

The Impact

The renovation of Building 23 was a testament to Barge's engineering expertise and commitment to excellence. Barge successfully transformed a historic asset into a modern, sustainable, and secure facility, meeting the evolving needs of the U.S. Air Force. The team's ability to balance preservation with innovation while also prioritizing sustainability and security positioned Barge as a valuable partner in this critical project. The project exceeded the original goal of designing to a LEED Silver level, making it the first LEED Gold building on the base.

The Challenge

The Cobb Energy Performing Arts Centre was the first planned Livable Communities Initiative (LCI) installation in the area and was designed as a cultural center for arts, entertainment, businesses, and residences. The Atlanta Regional Commission wanted a landscape design that would serve as the “front door” for the complex along Galleria Parkway, creating pedestrian facilities that would seamlessly connect existing and future developments and unify the character of the district.

The Solution

Barge Design Solutions developed a streetscape that addresses future growth for both pedestrians and vehicles. The design included a multi-use trail that ties in with the Cobb County trail system and incorporates artistic influences for the cultural center.

The Result

The Barge team's successful streetscape design has contributed to the Cobb Energy Performing Arts Centre's role as a vibrant cultural hub and a welcoming destination for visitors and residents alike. Barge's ability to create a pedestrian-friendly environment that integrates with the existing trail system and incorporates artistic elements demonstrates their expertise in urban planning and landscape design.

Landscape Architecture
Land Development
No items found.
Galleria Parkway Streetscape
Consult with an Expert
Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

We're collaborative by design. Let's team up.

Begin your project development journey today by contacting us.