Nashville International Airport (BNA) Terminal Lobby and International Arrivals Facility (IAF)

Location
Ohio
Market
Federal Government
Services
Architecture / Interior Design / Engineering

The Challenge

In 1934, Building 23 at Wright-Patterson Air Force Base was constructed as an aircraft hangar and test facility. More than 70 years later, the U.S. Air Force wanted to renovate the building to provide a modern lab facility for state-of-the-art energy research. It requested a design that retains the historic feel and aesthetic of the original building, while also creating a modern interior that meets security and force protection requirements.

The Solution

A three-story facility was created within the existing brick shell, adding new spaces for material processing, data acquisition, operations, and fabrication. The design also had special acoustical needs due to the use of vibration-sensitive equipment such as lasers and optical equipment. The superstructure is composed of a structural steel frame and designed to resist collapse in accordance with Antiterrorism/Force Protection (AT/FP) requirements.

Barge Design Solutions provided HVAC, plumbing, steam, lighting and power distribution, communications and security, utilities, storm drainage, lighting protection, and fire protection. Site work included sidewalks, curbs and gutters, access drive control systems, and site upgrades to meet AT/FP requirements. Architectural and interior design were also included as part of the project.

The Impact

The renovation of Building 23 was a testament to Barge's engineering expertise and commitment to excellence. Barge successfully transformed a historic asset into a modern, sustainable, and secure facility, meeting the evolving needs of the U.S. Air Force. The team's ability to balance preservation with innovation while also prioritizing sustainability and security positioned Barge as a valuable partner in this critical project. The project exceeded the original goal of designing to a LEED Silver level, making it the first LEED Gold building on the base.

The Challenge

Nashville International Airport (BNA) is the fastest-growing airport in the United States, serving over 18 million passengers annually in 2019. With projections exceeding 23 million passengers within five years, BNA developed the comprehensive $1.4 billion BNA Vision plan, set to complete in 2023. This plan includes a new terminal garage, lobby renovation, additional concourse, roadway improvements, and an on-site hotel. To address continued growth, BNA has also created BNA Vision 2.0, a $1.4 billion plan for 2024-2028.

The Solution

Barge Design Solutions is serving as a subcontractor to Hensel Phelps on Project 3, a 440,000-square-foot progressive design-build central terminal and International Arrivals Facility (IAF). Portions of this phased project are under construction, while other parts are in the design phase. The project is expected to be completed in 2023.

The upgraded central terminal will include a new marketplace, a 24-lane security checkpoint (doubling current capacity), ample natural light, and expansive views of the airfield. The IAF will include six new gates and a new U.S. Customs and Border Protection area.

The Result

Barge is responsible for providing the airside civil engineering design services for the IAF, situated between BNA's Concourses B and C. Our scope of work includes the demolition and restoration of the existing aircraft parking apron and trench drains (approximately 7,500 square yards of PCC ramp pavement) in conformance with Federal Aviation Administration (FAA) guidelines.

Engineering
Transportation
No items found.
Nashville International Airport (BNA) Terminal Lobby and International Arrivals Facility (IAF)
Consult with an Expert
Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

We’re collaborative by design. Let’s team up.

Begin your project development journey today by contacting us.